Team process and flow

A process exists to deliver small pieces of value often, not to keep everyone busy. Choose sprints or Kanban based on how your work arrives. Limit work in progress, finish before starting, and protect focus time from interruptions. Measure the team with delivery metrics like DORA, never to rank people, and use retrospectives to change one or two real things.

Not reviewedWritten with AI helpReading time: 15 minThe shop team's sprint boardDORA metrics and retrospectives

Author: bezzad

Contents

The problem: everyone is busy, nothing is done

It is the last day of the sprint for our online shop team. Five developers, two weeks. The board looks like this:

  1. To do: 4 items.
  2. In progress: 13 items. Every person has two or three things open.
  3. In review: 6 items, some of them waiting for four days.
  4. Done: 1 item.

Everyone worked hard. Nobody was lazy. But almost nothing reached customers. In the sprint review, the product manager asks: “So what can we show?” And the answer is: “Almost everything is 80% done.”

Why does this happen?

  1. Starting feels like progress. A new ticket is more fun than finishing the boring last 20% of an old one.
  2. Every interruption opens a new item. An urgent bug, a question from sales, a “quick” request from the manager.
  3. Review is nobody’s job. Everyone prefers to write their own code than to review someone else’s.
  4. Unfinished work has no value. A feature that is 80% done gives customers nothing.

Sprints or Kanban?

Two common ways to organize the work:

Sprints (Scrum) Kanban
Rhythm Fixed time boxes, one month or less (often two weeks). A continuous flow. No fixed boxes.
Planning At the start of each sprint, the team chooses a sprint goal and the work. Items are pulled one by one when there is capacity.
Change in the middle Possible, but the sprint goal should stay stable. Normal. The next item can change at any time.
Main limit The sprint length. A limit on work in progress for each column.
Good for Product work that can be planned for a few weeks. Work that arrives unpredictably: support, operations, bug fixes.

There is no right answer for every team. Many teams mix them: sprints for planning, and Kanban-style limits on the board. The important question is: how does our work arrive? If half of the work is urgent support requests, a two-week plan will break every week. Then Kanban, or sprints with a reserved capacity for support, fits better.

Limit the work in progress

Work in progress (WIP) is everything started and not finished. A WIP limit is a maximum number of items in a column. When the column is full, nobody starts a new item. Instead, they help finish an existing one.

To doGift cardsWishlist emailSearch filtersIn progressLimit: 4Discount codesOrder historyStock alertTax bugReviewLimit: 3 (full)Cart totalsLogin rate limitInvoice PDFDoneShipping priceNew logoReview is full: the next free person reviews before starting new work
With a limit of 3 on review, the next free person reviews before starting new work.

Why do fewer open items make the team faster? There is a simple relationship called Little’s Law. On average, over a stable period:

average cycle time = average work in progress / average throughput

13 items in progress / 2.5 items finished per week = about 5 weeks per item
 5 items in progress / 2.5 items finished per week = about 2 weeks per item
  1. Throughput is how many items the team finishes per week. It does not grow just because more items are open.
  2. Cycle time is how long one item takes from start to done.
  3. So with the same throughput, more open items means each item waits longer. Customers get each feature later.
  4. And context switching makes it worse. Every switch between tasks costs time to get back into the task.

The short rule many teams use: “Stop starting, start finishing.” In the daily stand-up, read the board from right to left: what is closest to done, and what is blocking it?

Protect focus

Developers need long blocks of quiet time for hard work. A day with five meetings and ten chat questions has no such block. The lead can protect focus:

  1. A rotating “shield”. Each week, one person handles urgent bugs and questions from other teams. The others are not interrupted. The role rotates so nobody does it all the time.
  2. Meeting-free time. For example, no meetings in the morning, or one full day per week without meetings.
  3. One entry for requests. New requests go to the backlog or to the shield, not directly to any developer in a private message.
  4. The lead says no, or “not now”. “We can do it next sprint, or we stop the discount feature for it. Which one is more important?” The lead makes the cost of the interruption visible.

Measure the team, not the people

How do you know the process is getting better? The DORA research program defines software delivery metrics. In the current DORA model there are five, in two groups:

ThroughputChange lead timeFrom commit to productionDeployment frequencyHow often we deployFailed deployment recovery timeTime to recover from a bad deployInstabilityChange fail rateDeploys that need a fixDeployment rework rateUnplanned deploysLook at both groups together: faster is good only if it stays stable
Throughput shows how fast changes flow. Instability shows how often they cause problems. Look at both together.
  1. Change lead time. Time from commit to running in production.
  2. Deployment frequency. How often the team deploys to production.
  3. Failed deployment recovery time. How long it takes to recover from a deployment that failed and needed immediate action.
  4. Change fail rate. The share of deployments that need immediate action, like a rollback or a hotfix.
  5. Deployment rework rate. The share of deployments that were not planned, made because of a problem in production.

A few rules about metrics:

  1. Look at the group together. Deploying more often is good only if the fail rate does not climb.
  2. Look at trends, not one number. “Lead time went from nine days to four days this quarter” is useful. One week alone says little.
  3. Never use them to rank people. When a number becomes a target for individuals, people improve the number, not the work. Story points per developer or commits per day are especially easy to game.
  4. Use them to start a conversation. “Lead time went up. Where do items wait?” Maybe in review, which brings you back to the WIP limit.

Retrospectives that change something

A retrospective is a regular meeting where the team looks at how it works and decides what to change. Many teams stop believing in retros, because the same problems come back every time and nothing changes.

A common structure has five steps, from the book “Agile Retrospectives” by Esther Derby and Diana Larsen:

1. Set the stageCheck last actions2. Gather dataFacts and feelings3. InsightsWhy did it happen?4. Decide1 or 2 actions,owner and date5. CloseWas it useful?Most of the value is in step four
Most of the value is in the fourth step: one or two concrete actions with an owner.
  1. Set the stage. Remind everyone of the goal. Start by checking the actions from the last retro: were they done? Did they help?
  2. Gather data. What happened? Facts, the board, the metrics, and how people felt.
  3. Generate insights. Why did it happen? Look for causes, not people.
  4. Decide what to do. One or two concrete actions, each with an owner and a date. Not “communicate better”, but “Mina sets up a review rotation, starting Monday”.
  5. Close. A short check: was this retro useful?
The same item three times in a row is a signal. If “review is slow” shows up in three retros, the action items were too vague or never done. Make the next action smaller and more concrete, put it on the board, and check it first in the next retro.

People must feel safe to speak in a retro. If the lead’s manager joins, or if a comment is later used against someone, people stop being honest. The lead protects this space.

Common mistakes

Mistake Result The right way
Starting new items when stuck Many open items, few done. A WIP limit. Help finish before starting.
Review is nobody’s job Items wait for days. Review before starting new work. A limit on review.
Interruptions go to anyone No focus time for anyone. A rotating shield and one entry for requests.
Two-week plans for unpredictable work The plan breaks every week. Kanban, or reserved capacity for support.
Ranking developers by story points People game the number. Team metrics, used for conversation.
Only looking at speed More deploys, more incidents. Throughput and instability together.
Retros with vague actions The same problems every time. One or two actions with an owner, checked next time.

Summary in six lines

  1. Busy is not the same as done. Unfinished work gives customers nothing.
  2. Choose sprints or Kanban based on how your work arrives. Mixing them is fine.
  3. Limit work in progress. With the same throughput, fewer open items means faster delivery.
  4. Protect focus with a rotating shield, meeting-free time and one entry for requests.
  5. Use the DORA metrics as a group, look at trends, and never use them to rank people.
  6. In each retro, check the last actions first, and leave with one or two concrete actions that have an owner.